Projects

The Plan was developed locally in response to the salmon and steelhead listings in the late 1990s. Since then, partners have worked with hundreds of landowners across the region to engage them in the need and get approval to implement a project based on the scientific guidance from the region. These projects are all consistent with the recovery plan and comprehensively represents our road map to success. Without engaged and willing landowners, project implementation does not happen. Without proper implementation, the region cannot prevail from the restrictions placed on us by the federal law.  In and of itself, the Plan is a non-regulatory document. It is not intended to be, nor may it serve as a regulatory document forcing landowner action.

Information on the projects implemented under the Plan can be found through an online portal called the Habitat Work Schedule.

The following comes from the Habitat Work Schedule. Clicking a live link on the left (project number) will take you to the system page for that project. Not all information may be available for every project, and the information is regularly updated.

Source: Habitat Work Schedule System Date: 4/7/2014

Number Name Status Start Date End Date Category Budget
01-01-2000-1 OCD Okanogan County Fish Passage Barrier Survey Completed 1/1/2000 4/30/2004 Non-Capital Projects $224,183.00
01-01-2005-1 Okan Co. Salmon Habitat Enhancement Completed 1/1/2005 12/31/2007 Non-Capital Projects $200,000.00
01-01-2005-2 CCT Okanogan River Thermal & Lidar Image-Phase 1 & 2 Completed 1/15/2005 2/28/2006 Non-Capital Projects $94,437.00
01-01-2006-1 OCD Okanogan Livestock and Water Program Completed 1/1/2006 8/31/2008 Non-Capital Projects $68,438.00
01-01-2007-1 OCD Okanogan County Irrigation Water Concept Conceptual 1/1/2007 Restoration Projects
01-01-2008-1 CCT Okanogan Land and Water Acquisition Program Active 1/2/2009 1/1/2017 Acquisition/Restoration (Combination) $2,400,000.00
01-01-2010-1 OCD Okanogan Conservation District Livestock Program Active 7/1/1998 6/1/2012 Restoration Projects $500,000.00
01-01-2014-02 OCD Okanogan River Fish Screen Implementation Ph II Proposed 1/1/2014 1/1/2015 Restoration Projects $165,000.00
01-2012-1 OCD Okanogan Livestock and Water Quality Proposed 3/11/2012 6/30/2013 Restoration Projects $248,506.00
01-2012-2 CCT Okanogan River Basin Cold Water Refugia and Tributary Flow Restoration Active 2/1/2011 4/30/2018 Non-Capital Projects $4,000,000.00
01-2012-3 CCT Okanogan River Basin Riparian Concept Conceptual 1/1/2012 1/1/2017 Restoration Projects
01-2012-4 CCT Okanogan Subbasin Predation Assessment Concept Conceptual 1/1/2012 1/1/2017 Non-Capital Projects
01-CAN-2001-1 CCT Okanogan River Restoration Initative (ORRI) Phase I & II Active 1/1/2001 12/31/2012 Restoration Projects $1,100,000.00
01-CAN-2007-1 CCT McIntyre Dam Fish Passage Completed 1/1/2007 11/1/2010 Restoration Projects $1,770,055.00
01-CAN-2009-1 CCT Vaseux Creek Evaluation Completed 1/1/2009 10/1/2010 Non-Capital Projects $25,000.00
01-CAN-2011-1 CCT Lower Shuttleworth Creek Instream Flow Concept Active 1/1/2011 12/1/2014 Restoration Projects $35,000.00
01-CAN-2012-1 CCT Ellis Creek Barriers Concept Conceptual 1/1/2012 1/1/2017 Restoration Projects
01-CAN-2012-10 CCT Vaseux Creek Irrigation Diversions and Instream Flow Concepts Conceptual 1/1/2012 1/1/2017 Non-Capital Projects
01-CAN-2012-2 CCT Inkaneep Creek Barriers Concept Conceptual 1/1/2012 1/1/2017 Restoration Projects
01-CAN-2012-3 CCT Lower Shingle Creek Barrier Concept Conceptual 1/1/2012 1/1/2017 Restoration Projects
01-CAN-2012-4 CCT Lower Shuttleworth Creek Barriers Concept Conceptual 1/1/2012 1/1/2017 Restoration Projects
01-CAN-2012-5 CCT Okanogan Lake Barriers Concept Conceptual 1/1/2012 1/1/2017 Restoration Projects
01-CAN-2012-6 CCT Okanogan River in Canada Channel Structure and Form Concept Conceptual 1/1/2012 1/1/2017 Restoration Projects
01-CAN-2012-7 CCT Skaha Lake Barrier Concept Conceptual 1/1/2012 1/1/2017 Restoration Projects
01-CAN-2012-8 CCT Upper Shingle Creek Concept Conceptual 1/1/2012 1/1/2017 Restoration Projects
01-CAN-2012-9 CCT Vaseux Creek Barriers Concept Conceptual 1/1/2012 1/1/2017 Restoration Projects
01-LCH-2011-2 USFS Eightmile Creek Fish Barrier Assessment and Implementation Concept Conceptual 1/1/2010 1/1/2013 Restoration Projects $2,300,000.00
01-LCH-2011-3 USFS Upper Cub Creek Riparian Fencing Concept Conceptual 1/1/2010 12/31/2011 Restoration Projects $25,000.00
01-LMO-2010-1 CCT Okanogan River Acquisition 72 Acres Completed 1/1/2009 12/31/2010 Acquisition Projects $900,000.00
01-LMO-2011-1 WDFW Okanogan River Fish Screening Inventory Completed 1/1/2007 1/1/2008 Non-Capital Projects $174,000.00
01-LMO-2011-2 OCD Okanogan River Riparian Habitat Concept Conceptual 1/1/2010 1/1/2013 Restoration Projects $372,000.00
01-LMO-2011-4 OCD Lower Middle Okanogan Sediment Identification and Implementation Concept Conceptual 1/1/2010 12/31/2013 Restoration Projects $550,000.00
01-LMO-2011-5 CCT Okanogan River Hwy 20 Acquisition Completed 1/1/2011 2/1/2012 Acquisition Projects $400,000.00
01-LMO-2011-6 CCT Okanogan River Shell Rock Point Acquisition Completed 1/1/2011 3/10/2012 Acquisition Projects $850,000.00
01-LMO-2012-1 CCT Okanogan River BOR Side Channel Concept Conceptual 3/1/2011 1/31/2012 Restoration Projects $140,000.00
01-LMO-2012-3 CCT Okanogan River Wanacut Creek Log Jam Conceptual 3/1/2011 4/30/2018 Restoration Projects $100,000.00
01-LMO-2012-4 CCT OCD Okanogan River Diversion Screening Active 7/1/2012 4/30/2018 Restoration Projects $1,000,000.00
01-LOU-2011-1 CCT Loup Loup Creek Culverts Completed 8/1/2008 12/1/2011 Restoration Projects $636,237.00
01-LOU-2011-2 CCT Loup Loup Water Lease Active 3/1/2012 12/31/2022 Restoration Projects $300,000.00
01-LOU-2011-3 OCD Loup Loup Sediment Reduction Identification and Implementation Concept Conceptual 1/1/2010 1/1/2010 Restoration Projects $210,000.00
01-LOU-2011-4 CCT Loup Loup Acquisition 4.01 Acres Completed 1/1/2010 4/1/2011 Acquisition Projects $65,000.00
01-LOU-2012-1 CCT Loup Loup Creek Instream Flow Concept Conceptual 1/1/2012 1/1/2017 Restoration Projects
01-LOW-2011-1 OCD Lower Okanogan TMDL Implementation Concept Conceptual 1/1/2010 1/1/2013 Restoration Projects $0.00
01-LOW-2011-2 OCD Okanogan River Basin Fish Screen Replacements Active 5/2/2011 6/30/2012 Restoration Projects $0.00
01-LOW-2011-3 OCD Lower Okanogan Irrigation Screens/Diversions Project Completed 1/1/2010 12/31/2013 Screen
01-LOW-2012-1 CCT Okanogan River Conservancy Island Active 3/1/2011 4/30/2015 Restoration Projects $200,000.00
01-LSA-1996-1 CCT Salmon Creek Instream Flow Agreement Active 3/1/2007 1/1/2017 Restoration Projects $1,000,000.00
01-LSA-1999-1 CCT Salmon Creek Assessment 99 Completed 4/20/1999 9/30/2000 Non-Capital Projects $92,000.00
01-LSA-1999-2 Salmon Creek Diversion Dam Design Completed 7/29/1999 10/31/2000 Non-Capital Projects $51,500.00
01-LSA-2000-1 CCT Salmon Creek - Low Flow Channel and Fish Passage at Confluence Active 8/1/2010 12/15/2014 Restoration Projects $400,000.00
01-LSA-2010-1 CCT Lower Salmon Creek Acquisition 14 Acres Completed 1/31/2009 12/31/2010 Acquisition Projects $112,000.00
01-LSA-2010-2 CCT Lower Salmon Creek Acquisition 1 Acre Completed 1/1/2009 12/31/2010 Acquisition Projects $280,000.00
01-LSA-2011-1 OCD Salmon Creek Well Development Active 6/14/2010 12/31/2011 Restoration Projects $71,940.00
01-LSA-2011-2 CCT Salmon Creek Sediment Reduction Inventory and Implementation Concept Conceptual 1/1/2010 1/1/2013 Restoration Projects $0.00
01-LSA-2011-3 CCT Upper & Lower Salmon Creek Instream Flows Concept Conceptual 1/1/2010 12/31/2013 Restoration Projects $375,000.00
01-LSA-2013-5 CCT Salmon Creek Acquisition Completed 5/1/2013 10/1/2013 Acquisition/Restoration (Combination) $850,000.00
01-LSA-2013-6 CCT Salmon Creek Acquisition 2 Completed 5/1/2013 10/1/2013 Acquisition Projects $330,000.00
01-LSA-2013-7 Salmon Creek Off Channel Habitat Completed 8/1/2014 10/30/2014 Restoration Projects $80,000.00
01-MID-2011-1 WDFW Mclaughlin Falls Fish Habitat Acqusition Completed 4/1/2010 12/1/2012 Acquisition Projects $700,000.00
01-MID-2011-2 CCT Okanogan River Instream Flows for Temperature Reduction Concept Conceptual 1/1/2010 12/31/2013 Restoration Projects $800,000.00
01-OMK-1998-2 CCT Omak Creek Stapaloop Creek Culvert and Instream Structures Completed 6/1/1997 12/1/1998 Restoration Projects $75,000.00
01-OMK-1999-1 CCT Omak Creek Mission Falls Barriers RM 5.5 Active 9/1/1999 11/30/2012 Restoration Projects $1,700,000.00
01-OMK-1999-2 CCT Omak Creek Mill Site Restoration RM 0.5 Completed 5/1/1999 9/30/2000 Restoration Projects $1,100,000.00
01-OMK-2000-1 CCT Omak Creek Road Decommissions Completed 7/1/2000 11/1/2005 Restoration Projects $59,413.00
01-OMK-2000-2 CCT Omak Creek Watershed Restoration and Sediment Reduction Completed 1/1/2000 11/13/2004 Restoration Projects $189,621.00
01-OMK-2004-1 CCT Omak Creek Haley Culvert Replacement RM 8 Completed 6/3/2004 12/1/2004 Restoration Projects $140,000.00
01-OMK-2006-1 CCT Omak Creek Lobe and Disautel Culvert Replacements (2) RM 15 & 17 Completed 6/1/2006 12/1/2006 Restoration Projects $216,372.65
01-OMK-2007-1 Omak Creek Bridge Replacement RM 1 Completed 6/19/2007 9/26/2007 Restoration Projects $95,000.00
01-OMK-2009-1 CCT Clark Creek Culverts (2) Completed 1/1/2009 1/12/2009 Restoration Projects $35,000.00
01-OMK-2009-2 CCT Omak Creek Marchand & Sam Culvert Replacements (2) RM 19 & 19.5 Completed 5/1/2009 12/1/2009 Restoration Projects $150,000.00
01-OMK-2010-1 CTT Omak Creek Camp Seven Creek Culverts (2) Completed 4/1/2010 12/1/2010 Restoration Projects $120,000.00
01-OMK-2010-2 CCT Omak (Upper) Creek Culvert Replacements (11) Completed 4/1/2010 12/1/2010 Restoration Projects $455,000.00
01-OMK-2010-4 CCT Omak Creek Grindstone Drainage Culverts (2) Completed 6/1/2010 12/1/2010 Restoration Projects $75,000.00
01-OMK-2010-5 CCT Omak Creek Dutch Anderson Drainage Culvert Completed 4/1/2010 12/1/2010 Restoration Projects $26,000.00
01-OMK-2010-7 CTT Omak Creek Swimptkin Creek Culvert Completed 10/1/2009 12/1/2010 Restoration Projects $6,000.00
01-OMK-2010-8 CCT Omak Creek Stapaloop Creek Culverts (3) Completed 1/1/2009 1/1/2010 Restoration Projects $35,000.00
01-OMK-2011-1 CCT Omak Creek Livestock Exclusion Fence Project Active 4/1/2011 5/30/2012 Restoration Projects $17,000.00
01-OMK-2011-3 CCT Omak Creek Culvert Replacements Concept Conceptual 1/1/2011 1/1/2013 Restoration Projects
01-OMK-2011-4 CCT Omak Creek Riparian Habitat Concept Conceptual 1/1/2011 12/31/2013 Restoration Projects $1,200,000.00
01-OMK-2011-5 Omak Creek Bank Stabilization RM 2.9 to 4.7 Completed 3/10/2011 1/1/2002 Restoration Projects $147,000.00
01-OMK-2012-1 CCT Omak (Upper) Creek Spring Developments (3) Proposal Proposed 4/1/2011 3/31/2012 Restoration Projects
01-OMK-2012-2 CCT Upper Omak Creek Barriers Phase ll Concept Conceptual 1/1/2012 1/1/2017 Restoration Projects
01-SIM-2005-1 CCFEG Similkameen-Okanogan Confluence Restoration Design Completed 1/1/2005 12/31/2007 Non-Capital Projects $177,750.00
01-SIM-2011-2 CCT Similkameen Cool Water Refugia Concept Conceptual 1/1/2010 12/31/2013 Non-Capital Projects $600,000.00
01-SIM-2011-3 CCT Similkameen Protection Concept Conceptual 1/1/2010 1/1/2013 Non-Capital Projects $2,350,000.00
01-SIM-2011-4 OCD Similkameen Sediment Reduction Projects Concept Conceptual 1/1/2010 1/1/2013 Restoration Projects $275,000.00
01-SIM-2014-1 OCD Similkameen RM 3.8 Habitat Design Proposed 1/1/2014 1/1/2015 Non-Capital Projects $200,000.00
01-STS-2004-1 CCT Abell - Barnaby Creek Culvert Replacement Completed 1/1/2004 1/11/2006 Restoration Projects $68,560.00
01-STS-2007-1 CCT Antoine Creek Culvert Replacement Completed 9/25/2007 2/1/2008 Restoration Projects $50,950.00
01-STS-2008-1 CCT Wild Horse Springs Creek Restoration Completed 2/1/2008 10/1/2008 Restoration Projects $80,000.00
01-STS-2008-2 CCT Wanacut Creek Livestock Management Completed 2/2/2008 10/2/2008 Restoration Projects $40,000.00
01-STS-2008-3 OCD Bonaparte Creek Livestock Exclusion Completed 8/25/2008 12/30/2009 Restoration Projects $25,578.00
01-STS-2010-1 CCT Bonaparte Creek Realignment Project Completed 2/1/2010 1/31/2011 Restoration Projects $120,000.00
01-STS-2010-2 CCT Nine Mile Creek Acquisition 3.83 Acres Completed 1/31/2010 12/31/2010 Acquisition Projects $191,500.00
01-STS-2010-3 CCT Omak Creek Acquisition 120 Acres Completed 12/31/2009 12/31/2010 Acquisition Projects $132,000.00
01-STS-2010-4 CCT Aeneas Creek Acquisition of 138 Acres Completed 2/1/2009 12/1/2010 Acquisition Projects $545,000.00
01-STS-2010-5 CCT Siwash Creek Water Resource Inventory Concept Active 2/1/2010 10/31/2012 Non-Capital Projects $65,000.00
01-STS-2011-1 CCT Okanogan Small Tributary Systems Fish Screening Concept Conceptual 1/1/2011 12/31/2013 Restoration Projects $175,000.00
01-STS-2011-10 CCT Antoine Creek Protection Concept Conceptual 1/1/2010 1/1/2013 Acquisition Projects $5,212,500.00
01-STS-2011-11 CCT Tonasket Creek Water Resource Inventory Active 2/1/2010 10/31/2012 Non-Capital Projects $65,000.00
01-STS-2011-12 CCT Nine Mile Acquisition 5.87 Acres Completed 1/1/2010 12/31/2011 Acquisition Projects $176,000.00
01-STS-2011-13 CCT Antoine Creek Instream Flow Acquistions Concept Conceptual 1/1/2010 1/1/2013 Restoration Projects $50,000.00
01-STS-2011-14 CCT Aeneas Creek Acquisition of 20 Acres Completed 2/1/2010 6/1/2011 Acquisition Projects $56,000.00
01-STS-2011-2 CCT Wild Horse Spring Creek Well Installation Proposal Active 5/20/2010 12/31/2014 Restoration Projects $50,000.00
01-STS-2011-3 CCT Wild Horse Spring Creek Realignment Completed 3/1/2011 11/15/2011 Restoration Projects $25,000.00
01-STS-2011-4 CCT Wild Horse Spring Creek Livestock Exclusion Phase l & Il Completed 2/1/2009 12/31/2010 Restoration Projects $6,000.00
01-STS-2011-5 CCT Wild Horse Spring Creek Culvert Replacements l & ll Completed 2/1/2009 12/31/2010 Restoration Projects $60,000.00
01-STS-2011-6 CCT Wild Horse Spring Creek Hardened Rock Crossing Completed 2/1/2009 1/31/2010 Restoration Projects $3,000.00
01-STS-2011-9 OCD Johnson Creek Riparian Planting Concept Completed 1/1/2010 10/1/2012 Restoration Projects $8,450.00
01-STS-2012-01 CCFEG East Fork Tunk Creek Culver Replacement Proposed 6/3/2012 12/31/2013 Restoration Projects $150,000.00
01-STS-2012-02 TU-WWP Ninemile Creek, In-Stream Flow Restoration Project Completed 3/1/2012 9/19/2012 Restoration Projects $225,000.00
01-STS-2012-03 TU-WWP Ninemile Creek, Riparian Restoration and Passage Improvement Completed 4/1/2012 12/31/2013 Restoration Projects $165,783.00
01-STS-2012-1 CCT Antoine Creek Diversion and Passage (2) Active 2/1/2011 4/30/2012 Restoration Projects $200,000.00
01-STS-2012-2 CCT Tunk Creek Ground Water Study Active 2/2/2010 12/31/2012 Non-Capital Projects $75,000.00
01-STS-2012-3 CCT Aeneas Creek Spawning Development Concept Completed 3/1/2011 5/1/2013 Restoration Projects $100,000.00
01-STS-2012-4 TU-WWP Tonasket Creek Instream Flow Enhancements Proposed 1/30/2012 1/30/2014 Restoration Projects $120,000.00
01-STS-2012-5 CCT Wild Horse Spring Creek McKinney Bridge Active 1/1/2011 4/30/2012 Restoration Projects $25,000.00
01-STS-2013-1 CCT Aeneas Creek Spring Headwaters Protection Completed 6/28/2013 2/14/2014 Acquisition Projects $70,000.00
01-STS-2013-2 CTT Antoine Creek Culvert Replacement Completed 9/1/2013 2/28/2014 Restoration Projects $40,000.00
01-STS-2013-3 CCT Ninemile Acquisition Completed 5/1/2013 12/24/2013 Acquisition/Restoration (Combination) $150,000.00
01-STS-2013-4 CCT Wanacut Creek Acquisition Completed 5/1/2013 10/1/2013 Acquisition Projects $60,000.00
01-STS-2013-7 CCT Antoine Creek Corral Relocation Completed 8/1/2013 10/1/2013 Restoration Projects $80,000.00
01-STS-2014-03 TU-WWP: Johnson Creek Barrier Passage Projects Proposed 12/2/2013 12/1/2014 Restoration Projects $195,000.00
01-STS-3013-4 CCT Wild Horse Spring Creek Culvert Replacement Completed 8/1/2013 12/23/2013 Restoration Projects
01-UPP-2002-1 CCFEG Okanogan/Similkameen Assess/feasibility/preliminary design Completed 4/12/2002 9/2/2005 Non-Capital Projects $282,000.00
01-UPP-2009-1 CCT Okanogan River Riverside Acquisition 37.35 Acres Completed 1/1/2009 12/31/2009 Acquisition Projects $125,000.00
01-UPP-2010-001 CCFEG - Driscoll Island Riparian Planting Completed 6/1/2010 8/1/2012 Restoration Projects $11,000.00
01-UPP-2010-1 CCT Wanacut Creek Channel Rehabilitation Completed 1/1/2010 12/31/2011 Restoration Projects $60,991.00
01-UPP-2011-1 CCT Driscoll Island Cross Channel Structure Completed 6/17/2010 12/31/2011 Restoration Projects $293,060.00
01-UPP-2011-2 CCFEG Driscoll Island Cold Water Refuge Design Active 5/2/2011 6/30/2013 Non-Capital Projects $42,500.00
01-UPP-2011-4 CCT North Reservation Boundary Okanogan River Side Channel Completed 4/10/2010 12/31/2011 Restoration Projects $20,000.00
01-UPP-2011-5 OCD Upper Okanogan Sediment Reduction Project ID and Implementation Concept Conceptual 1/1/2010 1/1/2013 Restoration Projects $225,000.00
01-UPP-2011-6 OCD Okanogan River Riparian Habitat IV Concept Conceptual 1/1/2010 12/31/2013 Restoration Projects $100,000.00
01-UPP-2012-1 CCT Okanogan River Cold Water Refugia Channel Creation Concept Conceptual 2/1/2011 2/29/2012 Restoration Projects $70,000.00
01-UPP-2012-2 CCT Wild Horse Spring Creek Hardened Rock Crossing II Completed 2/1/2010 1/1/2012 Restoration Projects $3,000.00
01-UPP-2014-001 CCFEG Janis Rapids Side Channel - Okanogan Weir Removal Project Proposed 1/1/2014 1/1/2016 Restoration Projects $80,000.00
01-xxx-2013-6 CCT Okanogan River Dogleg Acquisition Conceptual Acquisition/Restoration (Combination) $800,000.00
01/02-2012-1 OCD Okanogan & Methow Farm Assistance Concept Conceptual 1/1/2012 1/1/2013 Restoration Projects $185,196.00
02-02-2001-1 BOR Methow Subbasin Geomorphic Assessment Completed 1/1/2006 5/31/2008 Non-Capital Projects $220,060.00
02-02-2001-2 WDFW Fish Screening Projects Completed 1/1/1998 1/1/2001 Restoration Projects
02-02-2001-3 WDFW Methow Watershed Phase II Completed 1/1/2001 1/1/2005 Acquisition Projects
02-02-2008-1 MSRF Methow Basin Riparian Enhancement Program Completed 8/20/2007 8/19/2009 Non-Capital Projects $608,639.00
02-BBC-2000-1 OCD Beaver Creek Fish Passage Barriers (5) Completed 1/1/2000 1/1/2001 Restoration Projects $30,000.00
02-BBC-2001-1 OCD Beaver Cr Coordinated Resource Mgt Plan Completed 1/1/2001 1/1/2003 Non-Capital Projects $81,464.00
02-BBC-2005-1 OCD Fort-Thurlow Lower Beaver Piping Completed 1/15/2005 5/31/2007 Restoration Projects $180,913.00
02-BBC-2005-2 OCD Thurlow Transfer Ditch Barrier and Piping Concept Completed 1/1/2005 12/31/2007 Restoration Projects $475,122.00
02-BBC-2005-3 MSRF Upper Beaver Creek Habitat Improvement Project Active 5/5/2005 12/1/2020 Acquisition/Restoration (Combination) $740,000.00
02-BBC-2007-2 OCD Redshirt Barrier Removal Completed 1/1/2007 12/31/2007 Restoration Projects $75,400.00
02-BBC-2008-1 MSRF Operskalski Completed 5/31/2008 12/31/2013 Restoration Projects $60,000.00
02-BBC-2009-1 OCD Marrachi Diversion Completed 1/7/2009 10/8/2010 Restoration Projects $105,882.00
02-BBC-2011-2 TU-WWP Beaver Creek, No. 2 Instream Flow Enhancement Active 1/1/2012 12/31/2015 Restoration Projects $225,000.00
02-BBC-2011-3 TU-WPP Beaver Creek No. 1, 2, 3- Irrigation Efficiencies & Instream Flow, Active 12/31/2011 12/31/2012 Restoration Projects
02-BBC-2012-1 MSRF Marrachi Phase II Conceptual Restoration Projects
02-BBC-2012-2 TU-WWP Beaver Creek - 2012 Leases Completed 4/1/2012 9/1/2012 Restoration Projects $4,375.00
02-BBC-2012-3 YN Old Schoolhouse Fish Enhancement Project Completed 1/1/2012 11/30/2013 Restoration Projects $250,000.00
02-BBC-2013-1 MSRF Fort/Thurlow Phase II Active 1/1/2013 12/31/2014 Restoration Projects $50,000.00
02-BVC-2012-1 MSRF UBC Old Schoolhouse Active 4/1/2011 11/30/2015 Acquisition/Restoration (Combination)
02-BVC-2012-2 MSRF UBC Campbell Active 1/1/2010 11/30/2015 Acquisition/Restoration (Combination)
02-BVC-2013-1 MSRF Fine Riparian Completed 7/1/2010 12/31/2013 Riparian Enhancement
02-LCH-1999-1 Okan Co. Fulton Ditch Lining Project Completed 7/29/1999 3/31/2002 Restoration Projects $18,415.00
02-LCH-2000-1 MSRF Chewuch Canal & Fulton Canal Joint Study Completed 1/1/2000 1/1/2002 Non-Capital Projects $61,591.00
02-LCH-2000-2 MC River Assessment Unit Acquisitions Completed 1/1/2000 1/1/2015 Acquisition Projects $225,000.00
02-LCH-2000-3 WDFW Fulton Canal Fish Screen Completed 3/17/2000 10/31/2000 Restoration Projects $200,000.00
02-LCH-2004-1 YN Chewuch Reach Assessment Completed 1/1/2004 1/1/2007 Non-Capital Projects $167,000.00
02-LCH-2005-1 MSRF Chewuch Dam Modification Completed 1/1/2005 6/30/2009 Restoration Projects $272,091.00
02-LCH-2005-2 MSRF Chewuch Diversion Completed 10/10/2005 10/31/2007 Restoration Projects $149,381.00
02-LCH-2005-3 MSRF Fulton Dam - Barrier Removal Completed 5/5/2005 10/10/2010 Restoration Projects $543,223.00
02-LCH-2005-4 MSRF Macpherson Side Channel Completed 1/1/2005 12/31/2013 Acquisition/Restoration (Combination) $16,000.00
02-LCH-2007-1 MSRF Chewuch Basin Irrigator Efficiency Completed 4/1/2007 11/1/2008 Restoration Projects $294,000.00
02-LCH-2008-1 MSRF Pete Creek Project Assessment Completed 5/31/2008 12/31/2013 Restoration Projects $53,000.00
02-LCH-2009-1 MSRF Winthrop Confluence Project Riparian Completed 5/31/2009 12/31/2013 Restoration Projects
02-LCH-2010-1 TU-WWP: Chewuch No. 2 Piping Project (Little Chewuch) Completed 1/1/2010 12/31/2010 Restoration Projects $150,000.00
02-LCH-2010-1 TU-WPP Little Barkley Piping Completed 1/1/2010 12/31/2010 Restoration Projects
02-LCH-2011-02 YN Chewuch River 8 Mile Ranch Project Completed 11/1/2010 11/15/2012 Restoration Projects $750,000.00
02-LCH-2011-03 YN Chewuch River Mile 10 Fish Enhancement Project Completed 11/1/2010 10/31/2012 Restoration Projects $850,000.00
02-LCH-2011-05 YN Chewuch River Right Proposed 3/1/2011 12/16/2016 Restoration Projects $1,600,000.00
02-LCH-2011-1 TU-WWP Chewuch No. 1, three year drought lease Completed 1/1/2007 12/31/2010 Restoration Projects $350,000.00
02-LCH-2011-2 MSRF Pete/Bulldog Completed 6/1/2011 12/31/2013 Restoration Projects $0.00
02-LCH-2011-3 TU-WPP Fulton Ditch Instream Flow Proposed 5/1/2011 10/1/2016 Restoration Projects $1,300,000.00
02-LCH-2012-1 MSRF Lower Chewuch Watershed Beaver Restoration Active 4/15/2012 3/31/2017 Restoration Projects
02-LCH-2012-2 TU-WPP Eightmile Creek Irrigation Efficiencies & Instream Flow Enhancements Proposed 1/1/2012 12/31/2014 Restoration Projects
02-LCH-2013-04 YN Chewuch River Mile 11.75-13 River Left Fish Enhancement Project Active 9/1/2011 11/28/2014 Restoration Projects $438,024.00
02-LCH-2013-1 MSRF Satiqua Riparian Completed 7/1/2010 12/31/2013 Riparian Enhancement
02-LCH-2014-06 YN Chewuch Camp Ground Conceptual 8/11/2013 11/18/2016 Restoration Projects $1.00
02-LCH-2014-1 TU-WWP Chewuch River Instream Flow Project Proposed 1/1/2014 1/1/2015 Restoration Projects $350,000.00
02-LCH-UCH-2011-1 USFS Chewuch Road Inventory and Minimum Roads Analysis Concept Conceptual 1/1/2010 12/1/2013 Non-Capital Projects $60,000.00
02-LCH-UCH-2011-2 TU-WWP: Chewuch River No.3 Permanent Flow Enhancement, Active 1/1/2011 10/31/2013 Training Category $2,268,547.00
02-LMR-2011-3 WDFW Bridge 1 Riparian Acquisition Proposed 5/1/2011 6/1/2012 Acquisition Projects $305,000.00
02-LMR-2011-4 TU-WPP Lower Methow Irrigation Efficiencies & Instream Flow Enhancements Active 1/1/2010 12/1/2014 Restoration Projects $525,000.00
02-LOS-2000-1 WDFW Early Winter Canal Fish Screen Completed 3/17/2000 10/31/2001 Restoration Projects $151,000.00
02-LOS-2000-2 TPL Arrowleaf/Methow R Conservation Completed 1/1/2000 1/1/2003 Acquisition Projects $1,250,000.00
02-LOS-2002-1 MSRF Early Winters Creek Dike Removal Completed 6/1/2002 7/30/2006 Restoration Projects $168,859.00
02-LOS-2002-2 Okan Co. Early Winters Ditch Diversion Structure Completed 7/28/1999 3/31/2002 Restoration Projects $128,521.00
02-LTW-1999-1 Okan Co. Aspen Meadows Ditch Piping Completed 7/29/1999 3/31/2002 Restoration Projects $58,704.00
02-LTW-1999-2 Okan Co. Buttermilk Ditch Fish Screen Completed 5/14/1999 9/30/1999 Restoration Projects $37,557.00
02-LTW-1999-3 Okan Co. Little Bridge Creek Culvert Completed 5/14/1999 5/1/2000 Restoration Projects $6,400.00
02-LTW-1999-4 Okan Co. Tourangeau Ditch to Well Conversion Completed 7/29/1999 3/31/2002 Restoration Projects $6,500.00
02-LTW-1999-5 WDFW Twisp-Power Ditch Fish Screen Completed 7/29/1999 5/31/2000 Restoration Projects $130,000.00
02-LTW-2000-1 PWI - Assessment Twisp River Watershed Completed 1/1/2000 1/1/2002 Non-Capital Projects $185,626.00
02-LTW-2000-2 MC Acquisitions Twisp River Assessment Unit Completed 1/1/2000 1/1/2015 Acquisition Projects $2,017,092.00
02-LTW-2005-1 MSRF Elbow Coulee River Restoration Completed 5/5/2005 12/31/2013 Restoration Projects $152,850.00
02-LTW-2005-2 OCD Little Bridge Creek (Aspen Meadows) Completed 1/1/2005 6/30/2007 Restoration Projects $108,400.00
02-LTW-2005-3 MSRF Channel Reconstruction/ Twisp side-channel Completed 1/1/2005 1/1/2003 Acquisition/Restoration (Combination) $92,000.00
02-LTW-2005-4 OCD Hottell Intake Gate Completed 1/1/2005 1/1/2006 Restoration Projects $11,210.00
02-LTW-2005-5 MSRF Twisp River Native Plant Nursery Completed 1/1/2005 12/31/2013 Restoration Projects $0.00
02-LTW-2006-1 MSRF Twisp River Conservation Acquisition Completed 4/1/2006 12/31/2006 Acquisition Projects $200,835.00
02-LTW-2008-1 MSRF Poorman Creek Barrier Removal Completed 5/31/2008 12/31/2013 Restoration Projects $124,579.00
02-LTW-2008-2 MSRF Twisp River Conservation Acquisition 2 Completed 11/25/2008 11/25/2009 Acquisition Projects $481,579.00
02-LTW-2009-xx YN Lower Twisp River Reach Assessment Completed 1/1/2009 1/1/2010 Non-Capital Projects $167,000.00
02-LTW-2011-1 TU-WWP: Twisp River POD Change & Instream Flow Enhancement Active 12/31/2011 12/31/2013 Restoration Projects $100,000.00
02-LTW-2011-10 YN Twisp Ponds Habitat Ponds Intake Ditch Repair Completed 4/30/2011 11/1/2012 Restoration Projects $60,000.00
02-LTW-2011-2 TU-WPP Twisp River, Instream Flow Enhancement with Irrigation District Active 1/1/2012 12/31/2015 Restoration Projects $3,000,000.00
02-LTW-2011-6 YN Twisp Ponds Left Bank Large Wood Enhancement Completed 4/30/2011 11/1/2012 Restoration Projects $80,000.00
02-LTW-2011-7 MSRF Twisp Complexity Completed 10/27/2010 12/31/2013 Restoration Projects $59,500.00
02-LTW-2011-8 MSRF Twisp River Acquisitions 3 Active 5/9/2011 11/30/2014 Acquisition Projects $140,700.00
02-LTW-2011-9 YN Twisp Ponds Left Bank Floodplain Restoration Completed 4/30/2011 11/1/2012 Restoration Projects $20,000.00
02-LTW-2012-1 MSRF Siberian Side-channel Proposed 6/1/2012 12/31/2018 Acquisition/Restoration (Combination)
02-LTW-2012-2 MSRF Poorman Creek Wetland Habitat Active 6/1/2012 12/31/2014 Acquisition/Restoration (Combination)
02-LTW-2012-3 MSRF Elbow Coulee Phase II Rt/Lf Bank Active 12/1/2012 12/31/2018 Restoration Projects $0.00
02-LTW-2012-4 MSRF Twisp River - Gann Active 11/1/2011 11/30/2014 Acquisition/Restoration (Combination)
02-LTW-2012-5 MSRF Twisp River - Hadfield Active 10/1/2010 11/30/2014 Acquisition/Restoration (Combination)
02-LTW-2013-1 YN Twisp River Poorman Creek Road Side Channel Project Conceptual 1/1/2013 1/1/2014 Restoration Projects $60,000.00
02-LTW-2013-2 MSRF Daudon Riparian Completed 7/1/2009 12/31/2013 Riparian Enhancement
02-LTW-2013-3 MSRF TRLLC Riparian Completed 7/1/2009 12/31/2013 Riparian Enhancement
02-LTW-2014-03 YN Twisp River Mile 3 Fish Habitat Enhancement Project Active 6/1/2014 11/30/2014 Restoration Projects $70,000.00
02-LTW-2014-1 TU-WWP: Twisp River, Instream Flow Enhancement, Proposed 1/1/2014 12/1/2016 Restoration Projects
02-LTW-2014-2 TU-WWP: MVID Instream Flow Improvement Project Active 1/1/2014 6/30/2016 Restoration Projects $500,000.00
02-LTW-UTR-2011-1 TU-WPP Twisp River Instream Flow Enhancement Concept Conceptual 1/1/2011 12/1/2013 Restoration Projects $850,000.00
02-LWT-2014-03 YN-Poorman Creek Road Large Wood Enhancement Project Proposed 7/1/2014 11/30/2014 Restoration Projects $70,000.00
02-MMR-1999-1 Okan Co. Airey/Risley Ditch Removal Completed 5/14/1999 6/30/2001 Restoration Projects $29,596.00
02-MMR-2000-1 MC Middle Methow River Assessment Unit Acquisitions Completed 1/1/2000 1/1/2015 Acquisition Projects $2,307,579.00
02-MMR-2009-1 BOR Middle Methow Reach Assessment Completed 5/31/2009 6/30/2010 Non-Capital Projects $413,967.00
02-MMR-2010-1 MSRF Middle Methow River Hoffman Acquisition Completed 5/31/2010 8/31/2012 Acquisition Projects $211,429.00
02-MMR-2010-2 MSRF Methow River Risley Acquisition Completed 5/31/2010 8/30/2011 Acquisition Projects $131,890.00
02-MMR-2010-3 MSRF Methow River Bird Island Acquisition Completed 5/31/2010 1/31/2012 Acquisition Projects $0.00
02-MMR-2011-1 WDFW Silver Side Channel Restoration and Conservation Easement Completed 5/1/2011 12/7/2012 Acquisition Projects
02-MMR-2011-2 MSRF Middle Methow Sugar Dike Reach Implementation Active 1/1/2010 12/1/2018 Acquisition/Restoration (Combination) $600,000.00
02-MMR-2011-3 TU-WPP Middle Methow River M2 Phase 3 Concept Conceptual 1/1/2012 12/1/2015 Restoration Projects
02-MMR-2011-4 TU-WPP Middle Methow instream flow enhancement Proposed 1/1/2011 12/31/2014 Restoration Projects $1,150,000.00
02-MMR-2011-5 MSRF Methow River Acquisition 2011 RM 48.9 Active 5/10/2011 9/30/2016 Acquisition Projects $68,800.00
02-MMR-2011-6 YN M2 Eagle Rocks Large Wood Enhancement Completed 4/30/2011 11/1/2012 Restoration Projects $60,000.00
02-MMR-2011-7 BOR Winthrop to Wolf Creek Reach Assessment Completed 1/1/2010 12/31/2013 Non-Capital Projects
02-MMR-2012-01 CCFEG Methow Riparian Planting Active 1/1/2013 6/30/2016 Restoration Projects $95,000.00
02-MMR-2012-01 TU-WWP Barkley Diversion Reduction and Habitat Improvement Active 1/1/2012 12/31/2016 Water Quantity
02-MMR-2012-02 TU-WWP Bear Creek Storage and Reconnection Feasibility Study Conceptual 1/1/2012 12/31/2015 Water Quantity
02-MMR-2012-1 MSRF M2 Whitefish Island Active 10/10/2011 10/31/2014 Restoration Projects $1,445,000.00
02-MMR-2012-2 MSRF M2 WDFW Floodplain Restoration Active 10/10/2011 10/31/2014 Restoration Projects $0.00
02-MMR-2012-4 MSRF WDFW Floodplain wetland easement (McIvor) Active 6/1/2012 12/31/2014 Acquisition/Restoration (Combination)
02-MMR-2012-5 MSRF M2 Amundsen Floodplain Completed 3/1/2012 2/7/2014 Acquisition Projects
02-MMR-2012-6 MSRF Maltais Active 1/1/2011 12/31/2015 Acquisition/Restoration (Combination)
02-MMR-2012-7 TU-WWP Middle Methow Water Lease and/or In-basin Acquisition Concept Conceptual 1/1/2012 1/1/2013
02-MMR-2013-1 BOR Middle Methow Silver Reach Assessment Concept Conceptual 1/1/2013 12/1/2014 Non-Capital Projects
02-MMR-2013-2 YN M2 Two Channels East Side Channel Project Proposed 1/1/2013 1/1/2014 Restoration Projects
02-MMR-2013-3 YN M2 Two Channels Large Wood Enhancement Proposed 1/1/2013 1/1/2014 Restoration Projects $80,000.00
02-MMR-2013-4 YN M2 Sugar Dike Large Wood Enhancement Proposed 1/1/2013 1/1/2014 Restoration Projects $65,000.00
02-MMR-2013-5 MSRF 3R Riparian Completed 7/1/2009 12/31/2013 Riparian Enhancement
02-MMR-2013-6 MSRF Witte Riparian Completed 7/1/2009 12/31/2013 Riparian Enhancement
02-MMR-2014-1 MSRF M2 3R Concept Conceptual 10/10/2014 10/31/2016 Restoration Projects $1,000,000.00
02-MMR-2014-2 MSRF M2 3R Project Proposed 1/1/2014 1/1/2015 Restoration Projects $250,000.00
02-MMR-2014-3 MSRF M2 Logjam Island Concept Conceptual 10/10/2014 10/31/2016 Restoration Projects $700,000.00
02-MMR-2014-4 YN M2 1890s Side Channel Enhancement Project Proposed 6/30/2014 5/30/2015 Restoration Projects $1,300,000.00
02-MMR-2014-5 CCFEG Twisp to Carlton Reach Assessment I Proposed 1/1/2014 1/1/2016 Non-Capital Projects $200,000.00
02-MMR-2014-6 CCFEG Silver Side Channel Design Proposed 1/1/2014 1/1/2016 Non-Capital Projects $200,000.00
02-MMR-2016-1 MSRF M2 Bear Creek Complexity Conceptual 10/10/2016 10/31/2018 Restoration Projects $500,000.00
02-MMR-2016-2 MSRF M2 Complexity and Floodplain Restoration III Conceptual 1/1/2016 12/1/2018 Restoration Projects $2,500,000.00
02-UCH-1999-1 Okan Co. Skyline Ditch Pipe Installation Phase 1 & 2 Completed 5/14/1999 10/31/2000 Restoration Projects $176,000.00
02-UCH-2000-1 WDFW Skyline Canal Fish Screen Completed 3/17/2000 10/31/2001 Restoration Projects $165,000.00
02-UCH-2014-06 Chewuch RM 13-15.5 Conceptual 8/4/2013 11/18/2016 Restoration Projects
02-UMR-2000-1 Upper Methow Assessment Unit MC Acquisitions Completed 1/1/2000 12/31/2012 Acquisition Projects $7,094,757.00
02-UMR-2002-1 WDFW Methow River Basin Screening Completed 1/1/2002 1/1/2003 Restoration Projects $229,667.00
02-UMR-2003-1 CCFEG Rockview Diversion and Side Channel Restoration Completed 1/1/2003 1/1/2006 Restoration Projects $154,500.00
02-UMR-2006-1 MSRF Methow Valley Irrigation District (MVID) East Irrigation Diversion Completed 4/1/2006 12/31/2010 Restoration Projects $917,440.00
02-UMR-2007-1 MSRF Fender Mill Floodplain Restoration Completed 3/1/2007 10/31/2010 Acquisition/Restoration (Combination) $2,693,249.00
02-UMR-2007-2 BOR Big Valley Reach Assessment Completed 1/1/2007 12/31/2007 Non-Capital Projects $216,000.00
02-UMR-2008-1 YN Wolf Creek Road Bank Stabilization and Wood Enhancement Project Completed 4/30/2008 11/1/2009 Restoration Projects $90,000.00
02-UMR-2009-1 Private LO Weeman Bridge Side Channel Restoration Completed 1/1/2009 1/1/2011 Restoration Projects $54,000.00
02-UMR-2009-2 MSRF Heath Phase II Install 2 Bridges Completed 4/15/2009 12/31/2013 Acquisition/Restoration (Combination) $88,000.00
02-UMR-2009-3 MSRF Sletten and Green Habitat Complexity Projects Completed 5/31/2009 10/30/2009 Restoration Projects $30,000.00
02-UMR-2011-4 Whiteface Creek Culvert Replacement Concept Conceptual 1/1/2010 12/31/2011 Restoration Projects $160,000.00
02-UMR-2013-1 CCFEG Big Valley Wood and Floodplain Conceptual 1/1/2013 1/1/2015 Restoration Projects $330,000.00
02-UMR-2013-2 MSRF Wolfridge Riparian Completed 7/1/2009 12/31/2013 Riparian Enhancement
02-UMR-2014-2 Wolf to Winthrop Complexity Project Conceptual 6/1/2014 12/31/2018 Acquisition/Restoration (Combination)
02-UMR-2014-3 ? Suspension Bridge Habitat Complexity Project Conceptual 6/1/2014 12/31/2018 Restoration Projects
02-UTW-1999-1 Okan Co. Eagle Creek Ditch Fish Screen Completed 7/29/1999 3/31/2002 Restoration Projects $23,225.00
02-WHC-1999-1 WDFW Wolf Creek Reclamation Dist Fish Screen Completed 7/29/1999 9/30/1999 Restoration Projects $140,000.00
02-WHC-2000-2 Wolf Creek Channel Restoration Completed 8/1/2000 10/31/2000 Restoration Projects $20,000.00
02-WHC-2000-3 Wolf Creek Diversion/Patterson Mountain Completed 1/1/2000 9/30/2005 Restoration Projects $275,373.00
02-WHC-2007-1 YN Hancock Springs Restoration Project Phase I Completed 2/1/2007 10/31/2011 Restoration Projects $450,000.00
02-WHC-2010-1 YN Hancock Creek Restoration Phase 3 Completed 1/1/2011 12/31/2011 Restoration Projects $417,000.00
02-WHC-2011-1 CCFEG Wolf Creek Ditch and Fish Return improvement Conceptual 5/1/2011 12/1/2015 Restoration Projects $270,000.00
02-WHC-2012-1 TU-WPP Wolf Creek Piping & Diversion Enhancement Proposed 1/14/2012 1/14/2014 Restoration Projects
03-ENT-2009-1 BOR Entiat Tributary Assessment Completed 1/2/2008 1/31/2009 Non-Capital Projects $400,000.00
03-ENT-2010-1 CCD Entiat Intensively Monitored Watershed Active 2/28/2011 2/28/2020 Monitoring
03-ERC-2010-2011 CCD 2010/2011 Entiat River Appreciation Completed 8/1/2010 8/6/2011 Completed $13,000.00
03-LER YN - Entiat River RM 2.6-3.5 Habitat Enhancement Project Proposed 7/16/2014 7/31/2014 Restoration Projects $397,000.00
03-LER-2000-1 ICTU Entiat River Off-Channel Rearing Habitat Completed 5/1/2000 5/31/2005 Restoration Projects $201,096.00
03-LER-2000-2 ICTU Jon Small Off-Channel Rearing Pond Completed 5/1/2000 4/30/2005 Restoration Projects $195,842.00
03-LER-2006-01 CCD Bridge to Bridge Phase I Completed 1/16/2006 1/15/2008 Restoration Projects $185,000.00
03-LER-2006-2 CCD Entiat Demo Instream Rock Weirs Completed 7/1/2006 6/30/2009 Restoration Projects
03-LER-2006-3 CCD Lower Entiat Off-Channel Restoration Conceptual 1/2/2006 12/31/2020 Restoration Projects
03-LER-2007-04 CCD 2007 Entiat Riparian Enhancement/Restoration Completed 5/1/2007 12/31/2007 Restoration Projects $31,500.00
03-LER-2007-1 CCNRD & CCD Milne Entiat Instream Structures Completed 7/6/2007 11/30/2007 Restoration Projects $97,000.00
03-LER-2007-2 CCNRD & CCD Hanan Detwiler Instream Structures Completed 1/1/2007 12/31/2009 Restoration Projects $91,000.00
03-LER-2008-01 CCD Entiat Canal Log Boom Installation Completed 4/10/2008 6/30/2009 Restoration Projects $7,160.00
03-LER-2008-02 CCD 2008 Lower Entiat Riparian Restoration Completed 12/14/2007 9/30/2009 Restoration Projects $43,600.00
03-LER-2008-3 CCNRD Harrison Side Channel Completed 1/1/2008 8/30/2008 Restoration Projects $177,454.93
03-LER-2008-4 CCD Knapp-Wham Hanan Detwiler Consolidation Completed 1/1/2007 6/30/2010 Restoration Projects $552,912.00
03-LER-2009-1 CCNRD Entiat River Floodplain Reconnection Active 12/1/2009 12/31/2014 Restoration Projects $208,592.00
03-LER-2009-2 CCD Below the Keystone Bridge Completed 4/1/2009 6/1/2010 Restoration Projects $594,000.00
03-LER-2009-3 CCD HD Wells Project Completed 1/1/2009 4/21/2010 Restoration Projects
03-LER-2009-4 CCD Entiat PUD Canal System Conversion Concept Conceptual 2/14/2008 6/30/2012 Restoration Projects $496,584.00
03-LER-2010-001 CCD Entiat National Fish Hatchery Levee Removal and Restoration Project Completed 2/1/2009 6/1/2012 Restoration Projects $312,940.00
03-LER-2010-2 CCD 2010 Lower Entiat Riparian Restoration Completed 3/1/2010 11/30/2010 Restoration Projects $70,412.00
03-LER-2010-3 CCD Entiat ARRA Surface to Wells Conversion Completed 1/4/2010 6/1/2011 Restoration Projects $487,200.00
03-LER-2011-1 YN Keystone Habitat Complexity Project Completed 3/1/2011 12/31/2012 Restoration Projects $90,000.00
03-LER-2011-10 CCD Roaring Creek Flow Enhancement & Barrier Removal Completed 2/14/2008 12/1/2011 Restoration Projects $147,069.00
03-LER-2011-2 CCD Ecology Surface to Wells Conversions Active 1/4/2010 6/30/2014 Restoration Projects
03-LER-2011-3 CCD Habitat Farming Conceptual 6/1/2011 6/1/2012 Non-Capital Projects
03-LER-2011-4 BOR Lower Entiat Reach Assessment Completed 1/1/2011 1/31/2012 Non-Capital Projects $111,000.00
03-LER-2011-5 CCD Entiat Fish Screen Project Conceptual 6/1/2011 6/1/2012 Restoration Projects
03-LER-2011-6 CCD-USFS Road Management Conceptual 6/1/2011 6/1/2012 Non-Capital Projects
03-LER-2011-7 CCD Bridge to Bridge Phase III Conceptual 6/1/2011 6/1/2012 Restoration Projects $650,000.00
03-LER-2011-8 CCD McKenzie Ditch Project Conceptual 3/1/2011 4/2/2012 Restoration Projects $400,000.00
03-LER-2011-9 CCD 2011 Lower Entiat Riparian Restoration Completed 9/1/2010 11/30/2011 Restoration Projects $85,590.08
03-LER-2012-001 CCD Lower Entiat RM 0.8 - 2.3 Restoration Active 9/3/2012 12/31/2014 Restoration Projects $254,807.00
03-LER-2012-002 CCD Entiat PUD Canal System Conversion Phase II Active 1/1/2013 12/31/2014 Restoration Projects $204,000.00
03-LER-2012-003 CCD Entiat National Fish Hatchery Restoration Phase II Active 9/14/2012 12/31/2014 Restoration Projects $254,654.00
03-LER-2014-002 TU-WWP Roaring Crk Flow Restoration & Diversion Removal Proposed 1/1/2014 2/14/2015 Restoration Projects $85,000.00
03-LER-2014-1 CCD Entiat Canal System Conversion Project Proposed 1/1/2014 1/1/2015 Restoration Projects $300,000.00
03-MAD-2009-05 CCD Tillicum Creek Fencing Completed 10/17/2007 11/30/2010 Restoration Projects $80,000.00
03-MER-2001-1 CDLT Entiat River Stormy Creek Frank Thomas Acquisition Completed 5/1/2001 5/1/2001 Acquisition Projects $197,159.04
03-MER-2001-2 CDLT Entiat River Cottonwood Flats Owen-Ritchie Acquisition Completed 4/17/2001 4/17/2001 Acquisition Projects $272,293.27
03-MER-2001-3 CDLT Entiat River Grandma Creek Acquisition Completed 4/5/2001 12/12/2001 Acquisition Projects $1,280,832.67
03-MER-2002-4 CDLT Entiat River Beatley Acquisition Completed 11/5/2002 11/5/2002 Acquisition Projects $131,848.99
03-MER-2002-5 CDLT Entiat River Dill Creek Acquisition Completed 10/17/2002 10/17/2002 Acquisition Projects $73,587.85
03-MER-2002-6 CDLT Entiat River Nava Acquisition Completed 10/17/2002 10/17/2002 Acquisition Projects $41,381.59
03-MER-2003-7 CDLT Entiat River Brennegan Creek John Malone Acquisition Completed 3/17/2003 3/17/2003 Acquisition Projects $134,877.80
03-MER-2007-8 CDLT Entiat River Bancroft Conservation Easement Completed 10/19/2007 10/19/2007 Acquisition Projects $0.00
03-MER-2008-1 BOR Preston Reach Assessment Completed 1/1/2008 1/6/2009 Non-Capital Projects $138,000.00
03-MER-2008-2 BOR Stormy Reach Assessment Completed 1/1/2008 1/11/2009 Non-Capital Projects $28,000.00
03-MER-2010-1 CCD Entiat RM 21.5 LWD and Riparian Restoration Completed 7/1/2010 6/1/2011 Restoration Projects $535,000.00
03-MER-2010-10 CDLT Entiat River Tyee Ranch Conservation Easement Planning Completed 12/11/2009 12/31/2011 Non-Capital Projects $39,600.00
03-MER-2010-11 YN 3-D Reach Assessment Completed 12/15/2009 3/15/2010 Non-Capital Projects $47,000.00
03-MER-2010-2 CCNRD Entiat Dillwater Engineered Log Structures Completed 6/1/2010 10/31/2012 Restoration Projects $347,500.00
03-MER-2010-3 ? Upper Preston Reach Habitat Complexity project Completed 6/1/2010 12/31/2011 Restoration Projects $406,800.00
03-MER-2010-9 CDLT Entiat River Troy Acquisition Completed 12/11/2009 3/31/2010 Acquisition Projects $3,822,667.00
03-MER-2011-1 CCD Entiat River Tyee Ranch Restoration Completed 7/15/2011 6/1/2013 Restoration Projects
03-MER-2012-1 CCNRD Cottonwood Flats Bridge Removal Active 1/1/2014 12/31/2017 Restoration Projects $400,000.00
03-MER-2012-2 CDLT Entiat River Stormy Reach Acquisition Phase 2 Completed 12/8/2011 4/18/2012 Acquisition Projects $336,000.00
03-MER-2014-01 CDLT Entiat Gray Reach Acquisitions Active 12/10/2013 6/12/2015 Acquisition Projects $449,625.00
03-UER-2011-001 YN 3-D Habitat Enhancement Project Completed 7/16/2011 10/31/2012 Restoration Projects $2,200,000.00
03/04-2008-1 YN Upper Columbia Habitat Restoration Active 1/5/2008 1/1/2018 Restoration Projects $0.00
03/04-2014-01 WDFW Wenatchee-Entiat Rivers Screen Inventory & Design Proposed 1/1/2014 1/1/2015 Non-Capital Projects $100,000.00
03and04-2011-1 BOR Project Reviews Active 1/1/2009 12/31/2013 Non-Capital Projects
04-CHW-2006-1 USFS Chiwawa Recreation Restoration Completed 1/1/2006 1/10/2008 Restoration Projects $135,500.00
04-CHW-2006-2 CCNRD Alder Creek Culvert #1 and 2 Completed 2/28/2006 11/1/2007 Restoration Projects $315,774.01
04-CHW-2006-3 USFS Chikamin Pumice Mine and Road Restoration Project Completed 1/1/2006 1/1/2007 Restoration Projects $140,000.00
04-CHW-2007-1 CCNRD Clear Creek Culvert Replacements Completed 3/30/2007 10/19/2007 Restoration Projects $216,840.00
04-CHW-2009-1 CCD & CCPW Chiwawa Loop Road Wetland Mitigation Completed 1/1/2008 12/31/2011 Restoration Projects $34,000.00
04-CHW-2010-1 CCNRD Wenatchee Chiwawa Irrigation District Efficiences Conceptual 6/1/2010 12/31/2013 Non-Capital Projects $170,000.00
04-CHW-2011-2 USFS Chiwawa River Minimum Roads Analysis and Road System Improvements Proposed 1/1/2014 12/31/2015 Non-Capital Projects $25,000.00
04-CHW-2014-1 CCFEG Chiwawa Nutrient Enhancement Proposed 1/1/2014 1/1/2018 Restoration Projects $300,000.00
04-COL-1999-1 WSDOT SR 971 First Creek Culvert Replacement Completed 4/1/1999 6/1/1999 Restoration Projects $200,000.00
04-CSK-2006-00 CCD McDevitt Diversion Project Completed 12/1/2005 9/30/2006 Restoration Projects $2,000.00
04-CSK-2006-1 CCNRD Chumstick/Eagle Riparian Restoration 2007 Completed 3/1/2006 11/1/2007 Restoration Projects $73,283.64
04-CSK-2007-1 CCNRD Chumstick Creek Culvert Replacement 2009 Projects Completed 1/1/2007 10/1/2009 Restoration Projects $2,513,324.23
04-CSK-2008-001 CCD Chumstick Fish Passage Complex Completed 1/1/1999 12/31/2001 Restoration Projects $240,600.00
04-CSK-2008-1 CCNRD Chumstick 2009 North Road Culvert Replacement Completed 1/1/2008 10/31/2010 Restoration Projects $1,818,779.00
04-CSK-2010-1 CCNRD Chumstick Creek Culvert Replacement 2010 Project Completed 1/1/2009 11/30/2010 Restoration Projects $60,000.00
04-CSK-2010-2 CCNRD Chumstick Creek Culvert Replacement 2011 Project Completed 1/1/2009 11/30/2011 Restoration Projects $161,829.72
04-CSK-2010-3 CCD Freund Canyon Barrier Removal Active 6/1/2011 5/31/2014 Restoration Projects $148,000.00
04-CSK-2011-1 CCD 2011 Chumstick Clean-up and Riparian Restoration Completed 6/1/2009 12/30/2011 Riparian Enhancement $16,000.00
04-CSK-2011-1 TU-WWP Chumstick Creek Water Quantity Projects Conceptual 1/1/2011 1/1/2014 Restoration Projects $260,000.00
04-CSK-2011-2 CCNRD Chumstick Creek Culvert Replacement 2012 Project Completed 1/1/2009 12/31/2012 Restoration Projects $618,412.00
04-CSK-2011-3 USFS Chumstick Creek Minimum Roads Analysis and Road System Improvements Proposed 1/1/2012 12/31/2015 Non-Capital Projects $25,000.00
04-CSK-2012-1 TU-WWP Lower Chumstick Flow Enhancement Proposed 4/5/2012 10/15/2013 Restoration Projects $35,000.00
04-ICL-1987-1 ICTU Icicle Creek Reach Level Analysis Completed 1/1/1987 1/1/1988 Non-Capital Projects $47,500.00
04-ICL-1999-1 USFWS LNH Icicle Creek Restoration Project Active 1/1/1999 12/31/2015 Restoration Projects $5,700,000.00
04-ICL-2006-1 CCNRD Icicle Revegetation Fromm 7 Completed 5/18/2006 4/20/2007 Restoration Projects $21,114.00
04-ICL-2008-02 CDLT Lower Icicle Creek Habitat Conservation Completed 8/1/2008 12/28/2012 Acquisition Projects $420,000.00
04-ICL-2008-1 CDLT Icicle Creek Conservation Opportunities Outreach Completed 8/1/2008 12/21/2011 Non-Capital Projects $30,500.00
04-ICL-2009-1 CCNRD Lower Icicle Riparian Initiative Completed 7/1/2009 9/30/2010 Restoration Projects $40,749.00
04-ICL-2010-3 CDLT Icicle Creek Copper Notch Conservation Easement Completed 5/3/2010 5/21/2010 Acquisition Projects $0.00
04-ICL-2011-1 TU-WWP Icicle Creek Water Quantity Projects Conceptual 1/1/2011 12/31/2013 Restoration Projects $300,000.00
04-ICL-2011-3 USFS Icicle Creek Minimum Roads Analysis and Road System Improvements Proposed 1/1/2013 12/31/2015 Non-Capital Projects $25,000.00
04-ICL-2012-001 CCFEG Salmon Lifecycle Landscape Completed 7/2/2012 1/1/2013 Non-Capital Projects $10,000.00
04-ICL-2012-01 TU-WWP - Icicle Creek Boulder Field Assessment Conceptual Non-Capital Projects
04-ICL-2012-1 CCNRD Icicle Irrigation District Efficiencies Proposed 5/1/2012 12/31/2014 Non-Capital Projects
04-ICL-2012-2 TU-WWP Icicle diversion improvement project Conceptual 4/11/2012 1/15/2014 Restoration Projects $175,000.00
04-ICL-2014-1 TU-WWP Icicle Boulder Field Passage Design Proposed 1/1/2014 1/1/2015 Non-Capital Projects $185,000.00
04-LWR-1999-1 ICTU & WDFW Blackbird Island Riparian Planting Project Completed 3/20/1999 4/1/2001 Restoration Projects $250,000.00
04-LWR-1999-4 ICTU Blackbird Island Channel Development Completed 7/29/1999 10/31/2000 Restoration Projects $350,000.00
04-LWR-2001-1 CCD Riparian Revegetation on Wenatchee River 02 Completed 1/1/2001 1/1/2004 Restoration Projects $2,000.00
04-LWR-2003-1 CCNRD Lower Wenatchee Channel Migration Zone Study Completed 1/1/2003 1/1/2004 Non-Capital Projects $233,142.00
04-LWR-2003-2 CCD & CCPW Sleepy Hollow Bridge Restoration Project Completed 1/1/2000 12/31/2011 Restoration Projects $16,500.00
04-LWR-2004-2 CCNRD CMZ 10 Gagnon Completed 12/1/2004 11/9/2007 Restoration Projects $513,775.00
04-LWR-2005-1 PUD Chelan Dryden Fish Enhancement CMZ Project Completed 1/1/2005 12/1/2007 Restoration Projects $179,750.39
04-LWR-2005-2 CCNRD Wenatchee Revegetation Leavenworth Golf Course Completed 8/15/2005 4/10/2007 Restoration Projects $24,427.88
04-LWR-2006-01 CCD Cummings Restoration Project Completed 6/1/2006 9/29/2007 Restoration Projects $42,400.00
04-LWR-2007-07 CCD Jones-Shotwell Screen & Diversion Enhancement Completed 1/1/2007 1/10/2008 Restoration Projects $303,091.00
04-LWR-2007-1 ICTU Blackbird Island Kids Fishing /Steelhead Acclimatization Pond Completed 2/28/2007 12/1/2009 Restoration Projects $300,000.00
04-LWR-2007-2 WSDOT CMZ 6 US 2/97 Monitor Flats Channel Enhancement Completed 1/1/2007 10/1/2007 Restoration Projects
04-LWR-2007-6 CCNRD CMZ 20 Completed 1/1/2007 12/1/2010 Restoration Projects $169,932.00
04-LWR-2007-7 CCNRD CMZ 11 Completed 2/8/2007 8/30/2008 Restoration Projects $427,573.08
04-LWR-2007-8 CCNRD Irwin Riparian Restoration RM 24.3 Completed 11/1/2007 9/1/2008 Restoration Projects $99,932.00
04-LWR-2008-1 CCNRD Wenatchee River Riparian Enhancement RM 11 Completed 9/27/2008 9/26/2009 Restoration Projects $60,088.27
04-LWR-2008-2 CCNRD Wenatchee River Riparian Enhancement RM 13.6 Completed 9/27/2008 9/26/2009 Restoration Projects $39,474.05
04-LWR-2008-3 CDLT Lower Wenatchee Leavenworth Audubon Center Acquisition Completed 4/10/2008 4/10/2008 Acquisition Projects $0.00
04-LWR-2008-7 CCNRD Cashmere Pond Off-Channel Habitat Completed 1/11/2008 11/1/2009 Restoration Projects $433,992.11
04-LWR-2008-8 CCNRD CMZ 12 & 13 Completed 1/8/2008 8/30/2008 Restoration Projects $225,649.16
04-LWR-2008-9 PRCC Blackbird Island Side Channel Habitat Complexity Completed 1/10/2008 10/1/2009 Restoration Projects $150,000.00
04-LWR-2009-1 CCNRD Wenatchee River Riparian Enhancement RM 15.1 Completed 9/27/2009 9/26/2010 Restoration Projects $37,852.73
04-LWR-2009-10 CCNRD CMZ 6 Side Channel Completed 9/1/2009 11/1/2010 Restoration Projects $120,451.67
04-LWR-2009-2 YN Goodfellow/Chotzen Floodplain Reconnection Completed 8/16/2010 9/30/2010 Restoration Projects $360,000.00
04-LWR-2009-3 CCNRD Wenatchee River Riparian Enhancement RM 1.4 Completed 9/27/2009 9/26/2010 Restoration Projects $43,372.92
04-LWR-2010-03 CCD CMZ 2 Lower Sleepy Hollow Island Riparian Restoration Completed 6/17/2009 6/30/2011 Restoration Projects $52,000.00
04-LWR-2010-1 TU-WWP Lower Wenatchee River Instream Flow Enhancement Project Completed 4/1/2010 4/30/2013 Restoration Projects $3,467,842.00
04-LWR-2010-10 CCNRD Lower Wenatchee River Leavenworth Boat Launch Off-channel Reconnection Completed 6/1/2010 12/30/2011 Restoration Projects $149,500.00
04-LWR-2011-002 YN Sunnyslope ELJ Completed 7/18/2011 10/31/2012 Restoration Projects $400,000.00
04-LWR-2011-2 CCNRD Old Peshastin Mill Riparian Enhancement Active 5/9/2011 12/31/2015 Restoration Projects $86,285.00
04-LWR-2011-3 USFS Little Wenatchee River Minimum Roads Analysis and Road System Improvements Proposed 1/1/2015 12/31/2015 Non-Capital Projects $25,000.00
04-LWR-2012-001 CDLT Wenatchee River Lower Sleepy Hollow Floodplain Conservation Easements Proposed 5/2/2012 12/31/2013 Acquisition Projects $545,000.00
04-LWR-2012-1 CCNRD Lower Wenatchee Levee Removal Active 5/19/2012 12/31/2014 Restoration Projects $68,000.00
04-LWR-2014-01 UCSRB Joy Creek Fish Passage Project Active 2/1/2014 1/1/2015 Restoration Projects $100,000.00
04-LWR-2014-01 UCSRB Joy Creek Fish Passage Project Active 2/1/2014 12/1/2014 Restoration Projects $100,000.00
04-LWR-2014-02 TU-WWP Jones-Shotwell Irrigation Efficiency Upgrade Active 1/1/2012 3/31/2015 Restoration Projects
04-MSN-1995-1 CCNRD Brender Creek Habitat Development Completed 1/1/1995 1/1/1996 Restoration Projects $46,931.00
04-MSN-1995-2 CCD Lower Mission Creek Planting Project Completed 1/1/1995 1/1/1996 Restoration Projects $110,000.00
04-MSN-2005-1 CCD & CCPW Yaksum Creek-Horner Restoration Project Completed 6/1/2005 12/1/2010 Restoration Projects $36,900.00
04-MSN-2006-00 CCD Mission Creek Habitat Restoration and Streambank Stabilization Project Completed 1/1/2006 9/30/2006 Restoration Projects $32,600.00
04-MSN-2006-01 CCD Brender Creek Pond Completed 1/1/2006 9/1/2006 Restoration Projects $5,000.00
04-MSN-2006-1 CCNRD Mission Creek Riparian Restoration 2007 Completed 11/3/2006 11/1/2007 Restoration Projects $20,014.44
04-MSN-2008-00 CCD Mission Creek Diversion/Screens 2008 Completed 6/1/2008 11/5/2008 Restoration Projects $25,000.00
04-MSN-2010-03 CCD Yaksum Creek Riparian Enhancement Completed 4/27/2009 12/31/2010 Restoration Projects $25,000.00
04-MSN-2011-00 CCD Mission Creek Fish Passage Log Weirs Active 12/1/2009 12/31/2013 Restoration Projects $50,000.00
04-MSN-2011-1 TU-WWP Mission Creek Water Quantity Projects Conceptual 1/1/2011 12/31/2013 Restoration Projects $260,000.00
04-MSN-2011-2 USFS Mission Creek Minimum Roads Analysis and Road System Improvements Proposed 1/1/2013 12/31/2015 Non-Capital Projects $25,000.00
04-NAS-2005-1 WSDOT Mill Creek Culvert Replacement Completed 1/1/2005 9/1/2006 Restoration Projects $1,300,000.00
04-NAS-2006-1 PUD Grant - Nason Creek Godwin Parcel Purchase Completed 5/30/2006 4/16/2007 Acquisition Projects
04-NAS-2006-2 CCNRD Nason Creek 2007 Oxbow Reconnection Completed 1/11/2006 11/9/2007 Restoration Projects $800,000.00
04-NAS-2007-1 BOR Nason Creek Assessments Completed 4/1/2007 1/1/2009 Non-Capital Projects $414,000.00
04-NAS-2007-2 CCNRD BNSF Railroad and Wenatchee Basin Coordination Completed 12/13/2007 10/31/2009 Non-Capital Projects $54,125.00
04-NAS-2007-3 CCNRD Nason N4 oxbow reconnection Completed 1/10/2007 11/10/2009 Restoration Projects $791,300.50
04-NAS-2009-3 CCNRD Nason Creek Upper White Pine Reach 2 Restoration Active 9/1/2009 12/31/2015 Restoration Projects $225,000.00
04-NAS-2010-1 CCNRD Nason N1-KDIZ3 Floodplain Reconnection Proposed 6/1/2010 12/31/2015 Restoration Projects $107,300.00
04-NAS-2010-2 CCNRD Nason Creek Lower White Pine Reconnection Project Completed 3/1/2010 12/31/2013 Restoration Projects $99,166.00
04-NAS-2011-2 CCNRD Nason Creek Coulter Creek Barrier Replacement Active 5/9/2011 12/31/2014 Restoration Projects $169,134.00
04-NAS-2011-3 YN Nason Creek Inner Zone Project Identification Completed 1/1/2010 1/18/2011 Non-Capital Projects $15,000.00
04-NAS-2011-4 CDLT Nason Creek Lower White Pine Alcove Acquisition Completed 5/9/2011 3/14/2014 Acquisition Projects $294,700.00
04-NAS-2011-5 USFS Nason Creek Minimum Roads Analysis Completed 10/31/2010 10/31/2011 Non-Capital Projects $25,000.00
04-NAS-2014-002 CCNRD Nason Creek Kahler Complexity RM 7.4-6.0 Proposed 1/1/2009 12/31/2010 Restoration Projects $347,929.00
04-NAS-2014-01 CDLT Nason Creek UWP Horseshoe Bend Acquisitions Active 1/1/2014 12/31/2015 Acquisition Projects $379,700.00
04-PES-1987-1 Longview Fibre Culvert Conversion (7) Completed 1/1/1987 1/1/1988 Restoration Projects
04-PES-2001-1 ICTU & WDFW Brender Creek Riparian Planting Project Completed 3/20/2001 4/1/2001 Restoration Projects $55,000.00
04-PES-2003-1 USFS Sand Creek and Little Camas Creek Culvert Replacement Completed 1/1/2003 1/1/2004 Restoration Projects $150,000.00
04-PES-2004-00 CCD Mill Creek Ditch Fish Passage Improvement Project Completed 3/1/2004 12/30/2004 Restoration Projects $35,000.00
04-PES-2005-2 CCNRD Peshastin Creek Fishway Completed 2/1/2005 10/31/2006 Restoration Projects $237,950.31
04-PES-2008-1 YN Peshastin Creek Reach Assessment Completed 1/1/2008 4/1/2010 Non-Capital Projects $160,000.00
04-PES-2008-2 CCNRD Peshastin Irrigation Pipeline Schedule A Completed 1/6/2008 12/30/2011 Restoration Projects $906,622.00
04-PES-2009-1 CCNRD Peshastin Creek Reconnection Alternatives Analysis (RM 3.9) Completed 9/1/2009 3/29/2013 Non-Capital Projects $98,102.00
04-PES-2010-1 CCNRD Peshastin Irrigation District Pump Exchange Active 6/1/2010 12/31/2015 Water Quantity
04-PES-2011-2 USFS Upper Peshastin Creek Roads Inventory Active 1/1/2010 12/31/2019 Non-Capital Projects $100,000.00
04-PES-2011-3 TU-WWP Peshastin Creek Water Quantity Projects Conceptual 1/1/2011 12/31/2013 Restoration Projects $45,000.00
04-PES-2011-4 CCNRD Peshastin Irrigation Pipeline Schedule B Completed 1/1/2011 12/31/2011 Restoration Projects $304,960.86
04-PES-2011-5 CCNRD Mill Creek Culvert Replacement Mountain Home Ranch Rd Active 5/9/2011 12/31/2014 Restoration Projects $390,081.00
04-PES-2011-5 YN Peshastin Creek RM 0.8 Completed 3/31/2011 12/31/2012 Restoration Projects $160,000.00
04-PES-2011-6 YN Peshastin Fishway Conceptual 3/31/2011 12/31/2012 Restoration Projects $130,000.00
04-PES-2012-01 CCNRD Peshastin BRG Side Channel Active 1/1/2013 12/30/2016 Restoration Projects $199,000.00
04-PES-2012-1 CCNRD Upper Peshastin Creek Reach Assessment Conceptual Non-Capital Projects $135,000.00
04-PES-2012-2 CCNRD Ruby Creek barrier replacement Conceptual 4/1/2012 Restoration Projects $100,000.00
04-PES-2013-1 CCNRD Camas Creek Fish Passage Conceptual 4/29/2013 Restoration Projects
04-PES-2014-1 WDFW Peshastin Creek Confluence Channel Design Proposed 1/1/2014 1/1/2015 Restoration Projects $150,000.00
04-UWR-2000-1 WSDOT Skinney Creek Culvert Replacements (3) Completed 8/1/2000 10/1/2000 Restoration Projects $1,300,000.00
04-UWR-2005-1 CCNRD Upper Skinney Creek Culvert Completed 9/1/2005 8/15/2007 Restoration Projects $75,991.00
04-UWR-2007-3 CCNRD Beaver Creek #1, 2 & 3 Completed 3/1/2007 8/30/2008 Restoration Projects $235,676.55
04-UWR-2010-1 CCNRD Ponderosa Community Riparian Assessment and Planting Completed 9/1/2010 10/31/2012 Non-Capital Projects $25,077.00
04-UWR-2010-2 USFS Skinney Creek Restoration Proposed 6/1/2010 12/31/2012 Non-Capital Projects $125,000.00
04-UWR-2011-1 CCNRD Lake Wenatchee Water Quality Monitoring Completed 7/1/2008 12/31/2011 Non-Capital Projects $44,000.00
04-UWR-2011-2 YN Upper Wenatchee Stream Corridor Assessment and Habitat Restoration Strategy Completed 1/1/2011 9/22/2012 Non-Capital Projects $300,000.00
04-UWR-2012-1 TU-WWP Beaver Creek Diversion Conversion Conceptual 4/13/2012 4/14/2015 Restoration Projects
04-WEN-1999-1 CCNRD Chelan County Fish Barrier Inventory Completed 4/20/1999 12/31/2000 Non-Capital Projects $75,004.31
04-WEN-1999-2 CCNRD Wenatchee Watershed Planning Completed 1/1/1999 1/8/2007 Non-Capital Projects
04-WEN-2002-1 CCNRD FLIR Assessment Completed 1/1/2002 8/4/2002 Non-Capital Projects $65,317.00
04-WEN-2005-1 CCNRD Wenatchee Instream Flow Habitat Project Completed 2/1/2005 12/31/2006 Non-Capital Projects $187,469.01
04-WEN-2009-1 Chelan Co. Knotweed inventory and control Active 6/1/2009 12/31/2015 Restoration Projects $80,000.00
04-WEN-2010-1 CCFEG Assessing Nutrient Enhancement Logistics - Upper Columbia Completed 6/1/2010 12/31/2012 Non-Capital Projects $9,875.00
04-WEN-2011-1 CCFEG Wenatchee Nutrient Assessment Active 5/31/2012 11/29/2013 Non-Capital Projects $256,828.00
04-WEN-2011-2 Chelan County Watershed Outreach Plan Completed 1/1/2011 12/31/2012 Non-Capital Projects $8,000.00
04-WEN-2011-3 USFS Wenatchee River mainstem Minimum Roads Analysis and Road System Improvement Proposed 1/1/2015 12/31/2015 Non-Capital Projects $25,000.00
04-WHI-2001-1 USFS White River Oxbow Restoration Project Completed 1/1/2001 1/1/2002 Restoration Projects
04-WHI-2003-1 USFS White River Log Jam Completed 1/1/2003 7/1/2005 Restoration Projects $80,000.00
04-WHI-2005-1 CDLT White River Martin Acquisition Completed 1/28/2005 1/28/2005 Acquisition Projects $170,000.00
04-WHI-2006-2 CDLT White River Bjorgen Acquisition Completed 2/16/2006 2/16/2006 Acquisition Projects $96,333.01
04-WHI-2006-3 CDLT White River Kasparek Acquisition Completed 2/15/2006 2/15/2006 Acquisition Projects $35,955.39
04-WHI-2006-4 CDLT White River Kincaid Acquisition Completed 5/18/2006 5/18/2006 Acquisition Projects $112,408.13
04-WHI-2006-5 CDLT White River Quintana-Leon Acquisition Completed 9/29/2006 9/29/2006 Acquisition Projects $259,184.13
04-WHI-2006-6 CDLT White River Two Rivers Acquisition Completed 10/3/2006 10/3/2006 Acquisition Projects $587,544.99
04-WHI-2008-7 CDLT White River Quintana-Leon II Acquisition Completed 5/15/2008 5/15/2008 Acquisition Projects $315,000.00
04-WHI-2008-8 CDLT White River Tiegel Acquisition Completed 5/15/2008 5/15/2008 Acquisition Projects $199,500.00
04-WHI-2010-10 CDLT White River Tall Timber Ranch Conservation Easement Completed 9/1/2009 10/22/2010 Acquisition Projects $583,810.00
04-WHI-2010-11 CDLT White River Nason View Acquisition Completed 8/1/2009 3/27/2012 Acquisition Projects $684,000.00
04-WHI-2010-12 CDLT White River RM 9 Conservation Easement Completed 6/1/2010 9/30/2012 Acquisition Projects $440,000.00
04-WHI-2010-9 CDLT White River RM 8.5 Conservation Easement Completed 6/1/2010 12/31/2011 Acquisition Projects $194,000.00
04-WHI-2011-002 CCFEG Napeequa and White River Riparian Planting Completed 3/1/2011 12/30/2011 Restoration Projects $47,400.00
04-WHI-2011-1 CCFEG Large Wood Atonement White River Active 5/9/2011 12/31/2014 Non-Capital Projects $352,392.00
04-WHI-2011-3 USFS White River Minimum Roads Analysis and Road System Improvements Proposed 1/1/2015 12/31/2015 Non-Capital Projects $25,000.00
04-WHI-2012-13 CDLT White River Tall Timber Ranch Conservation Easement Phase 2 Active 4/11/2012 6/30/2014 Acquisition Projects $229,500.00
05-1614 ICTU Beebe Creek Channel Reconfiguration Completed 2/6/2006 2/6/2008 Restoration Projects $399,948.00
08WRIA44/50-01 Voluntary Regional Agreement (VRA) Feasibility Study- Columbia River Active 1/1/2007 12/31/2009 Non-Capital Projects
13-CHMSTK-2013 CCD Old Barn Farm Restoration Completed 3/5/2010 6/30/2013 Water Quality
2 Witnessing Change Conceptual 1/1/2012 10/1/2012 Monitoring
2006WRIA50-01 East Foster Creek Sediment Control Structure #1 Completed 9/1/2006 11/30/2006 Restoration Projects $135,000.00
2007WRIA50-01 Riparian Roads Survey Completed 2/1/2007 6/30/2007 Restoration Projects
2007WRIA50-01 Foster Creek Slope Stabilization Completed 4/1/2006 10/30/2007 Restoration Projects
2008WRIA44-01 Sand Canyon Creek Clean-Up Spring 2008- Phase 1 Completed 3/1/2008 3/15/2008 Restoration Projects $12,040.00
2008WRIA44-02 Sand Canyon Creek Clean-Up Fall 2008- Phase 2 Completed 9/15/2008 10/25/2008 Restoration Projects $2,300.00
2008WRIA50-01 Bridgeport High School Senior Projects Completed 9/1/2008 6/15/2009 Restoration Projects
2008WRIA50-02 Feasibility of Rearing Ponds near Chief Joseph Dam Proposed 12/1/2008 12/1/2010 Non-Capital Projects
2008WRIA50-02 East Foster Creek Sediment Control Structure #2 Completed 2/14/2006 10/1/2008 Restoration Projects
2008WRIA50-03 Bridgeport Bar Water System Consolidation Proposed 12/1/2008 12/1/2010 Restoration Projects
2009 WRIA 50-1 West Foster Creek Headcut Repair Proposed 7/1/2010 6/30/2012 Restoration Projects $250,000.00
2009 WRIA 50-1 Continued Operation and Maintenance of East Foster projects Active 6/30/2008 9/30/2012 Restoration Projects
2009WRIA50-1 Lower Moses Coulee Recharge Basin Completed 8/30/2009 6/30/2011 Restoration Projects $42,500.00
2010 WRIA 44 OE Volunteer Monitoring Program at Rock Island Lakes Proposed 7/1/2010 6/30/2012 Restoration Projects $30,000.00
2010 WRIA 44/50 Wetlands and Ponds Assessment, Douglas County Proposed 1/1/2009 8/31/2013 Restoration Projects $350,000.00
2010 WRIA 50-2 West Foster Creek Stream Restoration Proposed 7/1/2011 6/30/2013 Restoration Projects $150,000.00
2011-Basinwide-1 Large Wood Coordination Conceptual 9/20/2011 12/30/2011 Non-Capital Projects
2011WRIA 50 Livestock Access Project Active 11/1/2011 6/30/2012 Restoration Projects $35,500.00
2011WRIA50-01 Lower Moses Coulee Shallow Aquifer Recharge Feasibility Study Proposed 7/1/2011 6/30/2012 Non-Capital Projects $167,500.00
BAS-2012 Lamprey Conceptual Planning
RP-01-01-2004-1 CCT Okanogan Basin Monitoring and Evaluation Program (OBMEP) Active 3/26/2004 1/1/2018 Non-Capital Projects
RP-01-01-2008-1 CCT Okanogan Subbasin Habitat Implementation Program (OSHIP) Active 2/1/2008 1/1/2017 Restoration Projects
RP-MOA YN Yakama Nations Action Agency MOA Active 1/1/2009 3/9/2018 Non-Capital Projects
RP-MOA CCT Colville Confederated Tribes Action Agency MOA Active 9/3/2008 3/9/2018 Non-Capital Projects
test 2 Test 2 RM 2 Active 1/1/2014 1/31/2014 Restoration Projects
WEN-ENT-2012-2018 TU-WWP Beaver Reintroduction and Flow Augmentation Project Proposed 4/4/2012 6/15/2018 Restoration Projects $250,000.00
WRIA 44/50-04 Foster Coulee and Rock Island Creek Surface Water Storage Feasability Study Proposed 3/1/2009 6/30/2010 Non-Capital Projects $93,750.00
WRIA 50-Steelhead-1 Lower Foster Creek Steelhead Habitat Enhancement Proposed 5/7/2012 12/30/2013 $92,000.00
WRIA PA Planning and Assessment Projects 2006-2010 Active 1/1/2006 12/30/2010 Restoration Projects
WRIA44/50-02 Stream Monitoring and Water Quality Active 1/1/2007 6/30/2012 Non-Capital Projects